A 3.7 MW DC solar project spanning 16 acres at the Santa Margarita Ecological Reserve, delivering clean electricity to the cities of Temecula and Lake Elsinore while supporting San Diego State University's ongoing renewable energy and environmental research programs. The project reduces local utility power costs by approximately 15% and serves as a model for future solar development in California.

smer-03-web
SMER Solar project in Santa Margarita Ecological Reserve, Temecula, CA

Background

Located approximately 4 miles southwest of Temecula, California, the Santa Margarita Ecological Reserve (SMER) Research 1 Solar project occupies 16 acres of land that sits at a unique crossroads of renewable energy production, ecological conservation, and academic research. The cities of Temecula and Lake Elsinore purchase the clean energy generated by the solar farm under a power purchase agreement, reducing their reliance on local utility power by approximately 15%.

BioStar Renewables provided full development and EPC services for the project, along with ongoing Operations and Maintenance (O&M) and asset management. At peak construction, the project supported approximately 30 jobs and has since been recognized as a model for future solar development across California.

Client: City of Temecula & Lake Elsinore, CA

Location: Temecula, CA

Technology: Solar PV

Year: 2025

A Model for California Solar Development

The SMER Research 1 project demonstrates how solar development can be successfully integrated into ecologically sensitive landscapes without compromising environmental integrity. Sited within the Santa Margarita Ecological Reserve, the project underwent careful planning to ensure compatibility with the reserve's conservation mission. The result is a high-performing solar asset that generates clean energy for two municipalities while coexisting with the reserve's broader ecological and research objectives.

The system's GameChange Solar fixed-tilt racking — spanning 28 rows across the site — is designed for durability, low maintenance, and performance in demanding weather conditions. Chint Inverters provide high efficiency and advanced grid support capabilities, ensuring reliable energy delivery and optimal long-term output.

Highlights

  • System Capacity: 3.7 MW DC
  • Solar Panels: 10,000+ photovoltaic modules
  • Site Area: 16 acres
  • Grid Offset: Approximately 15% reduction in local utility power costs for both cities
  • Energy Purchasers: City of Temecula and City of Lake Elsinore
  • Jobs Created: Approximately 30 at peak construction
  • Project Type: Community solar / municipal power purchase agreement

BioStar's EPC Approach

Emissions Reduction Impact

BioStar Renewables provided turnkey Engineering, Procurement, and Construction services, along with ongoing Operations and Maintenance and asset management, giving the project's municipal stakeholders a single, accountable partner across the full project lifecycle. Our in-house expertise spans:

  • Development & Feasibility: Site assessment, energy modeling, interconnection strategy, and financial structuring
  • Engineering: System design, electrical engineering, structural analysis, and permitting
  • Procurement: Sourcing and logistics for panels, inverters, racking, and balance-of-system components
  • Construction: Full project management, civil work, electrical installation, and commissioning
  • Operations & Maintenance: Ongoing monitoring, maintenance, and performance reporting to protect long-term asset value
  • Asset Management: Financial and operational oversight to maximize project performance over the system's lifetime
CO2 reduction icon big

0+

metric tons of CO₂ emissions displaced per year
gas powered cars removed icon

0

gas-powered cars removed from the road per year
homes' energy reduction icon

0

homes electricity usage
for an entire year

About BioStar Renewables

BioStar Renewables is a leading developer and EPC contractor specializing in commercial, industrial, municipal, and institutional solar projects across the United States. From navigating complex regulatory and ecological environments to delivering long-term operations and asset management services, BioStar provides end-to-end expertise for solar projects of all scales and settings. Learn more about BioStar.

Side view of SMER Solar project in Santa Margarita Ecological Reserve, Temecula, CA

About the Ecological Reserve

The Santa Margarita Ecological Reserve is a protected natural area managed in partnership with San Diego State University, encompassing diverse habitat types in southwestern Riverside County. The reserve supports active field research across ecology, biology, environmental science, and now renewable energy — serving as an outdoor classroom and research hub for SDSU students and faculty.

SMER Solar project ribbon cutting at Santa Margarita Ecological Reserve

Explore more projects

BioStar Renewables star icon small
Explore our innovative projects that drive sustainability, reduce carbon footprints, and transform energy systems worldwide.
Seaboard Energy Renewable Diesel Plant
BioStar Renewables partnered with Seaboard Energy to develop and construct a behind-the-meter solar array that is producing renewable electricity for the Seaboard’s renewable diesel plant in Hugoton, KS.
Hallmark Solar Project
Hallmark’s 979 kW solar installation produces over 1.3 million kWh annually, helping reduce electricity demand by roughly 10%. This project delivers meaningful sustainability benefits, including a reduction of 39 metric tons of CO2 each year and environmental savings equal to 4,430 gallons of gasoline.
Westtown School Solar Project
The system spans approximately 8 acres and consists of a 2.013 MW DC (1.5 MW AC) solar field designed to provide a substantial portion of the campus’s electricity needs. Once operational, the project is expected to generate more than 3 million kWh of clean energy annually, offsetting roughly 90% of Westtown School’s electricity usage.

Let's continue the conversation
and build a greener future together.

Discover modern sustainable solutions that reduce costs and environmental impact.
Take the first step today!

9400 Reeds Road Suite 150
Overland Park, KS 66207
(913) 369-4100

©2026. Biostar Renewables, LLC. All Rights Reserved.