Pavant III Solar Project
Location: UT | Industry: Utility | Technology: Electricity | Role: InstallerE Light was responsible for all AC, DC, grounding, control wiring, module installation and wire management on this 25.37 MW tracker project. We also performed the lay out and conduit installation of 11 PCS inverter pads along with setting and connecting all equipment. This project utilized an above ground cable tray system for routing DC and control cabling that connected through an in ground concrete vault to the equipment pad. The medium voltage cables, however were all underground.